Installation Verification
After the FusionDC1000 is installed, you need to verify the installation.
Table 11-1 Post-installation checklist
No.
Check Item
Check
Method
Expected Result
1
Pre-fab. module
installation
Observe
The installation conforms to the
design requirements.
2
Equipment
appearance
Observe
● The equipment is intact and free
from inclination, distortion, pain
drop, and rust.
● All connections are secure.
3
Water pipe
connections
Observe
Water pipes are securely connected.
4
Thermal insulation
layers on water
pipes
Observe
All pipes are seamlessly wrapped with
thermal insulation layers.
5
External grounding Observe
● Each pre-fab. module has at least
two ground points and is grounded
securely with a ground resistance
of 10 ohms or less.
● Each row of cable trays has at least
two ground points and is grounded
securely with a ground resistance
of 10 ohms or less.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
11 Installation Verification
Issue 01 (2021-04-20)