The figures provided in this document illustrate only installation and
connection methods. The actual product appearance prevails.
●
Unless otherwise specified, the unit for the dimensions in the figures provided
in this document is mm by default.
●
Before using this document, understand the actual product configurations,
solution configuration for the data center in use, type of power grid used by
the customer, and internal configuration of each pre-fab. module.
●
When performing operations (such as installing an awning or outdoor unit)
over the top of a pre-fab. module, take measures to protect the top of the
pre-fab. module against damage. Do not perform operations such as arc
welding, drilling, and cutting on the top of a pre-fab. module.
Table 1-1 Reference documentation
Item
Document Name
FusionModul
e
FusionDC1000B Prefabricated Modular Data Center
V100R021C00 Installation Guide
FusionDC1000B Prefabricated Modular Data Center
V100R021C00 Commissioning Guide
FusionDC1000B Prefabricated Modular Data Center
V100R021C00 Maintenance Guide
UPS
UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power
Module)
Smart cooling
product
NetCol8000-A013 In-room Air Cooled Smart Cooling Product
User Manual (800 mm Width)
NetCol8000-A (045, 055, 060, 090, 120) In-room Air Cooled
Smart Cooling Product User Manual
ECC
ECC800 Data Center Controller V100R003C00 User Manual (for
ECC800-Pro)
NetEco
(For Customer) iManager NetEco 6000 V600R009C00 Device
Installation and Commissioning Guide
FusionDC1000B Prefabricated Modular Data Center
Quick Guide (2020, Nigeria, Platform Capital
Refinery DC)
1 Quick Guide Usage
Issue 01 (2021-01-05)
Copyright © Huawei Technologies Co., Ltd.
2
Summary of Contents for FusionDC1000B
Page 45: ......
Page 46: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 77: ......
Page 82: ......
Page 83: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 98: ...Window CB DH 1 Window CB PR B1 ECC NO M001 Monitoring Device Layout Diagram ...
Page 110: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 111: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 112: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 113: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 114: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 115: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 116: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 117: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 118: ...NO F002 Fire Extinguishing System Conceptual Diagram CE ...
Page 119: ......
Page 120: ...Window CB DH 1 Window CB PR B1 EXIT Exit DH 3 NO F003 Emergency Exit Diagram ...