FusionModule1000A20 Prefabricated All-in-One Data
Center
Maintenance Guide
2 Operation and Maintenance Preparations
Issue 01 (2019-07-15)
Copyright © Huawei Technologies Co., Ltd.
5
The documents provided in the solution only include the special maintenance items,
maintenance methods, and precautions of the components. For other maintenance items of the
components, see the documents delivered with the components.
Table 2-2
Maintenance documents to be prepared
Component
Document
FusionModule1000A
FusionModule1000A20 Prefabricated
All-in-One Data Center V200R003C10
Initial Configuration Parameter Manual
AC/DC power system
TP48200B-N20B2, TP48200B-N20B3,
TP48200B-L20B2, TP48400B-N20B3,
TP48400B-L20B1 Indoor Power System
Installation Guide
TP48600B-N20B1 Indoor Power Supply
Installation Guide
TP482000B V300R002C03 Central Office
Power System User Manual
(TP482000B-N20B1,TP482000B-N20B2,TP
481200B-N20B1 and TP481200B-N20B2)
ECC800
ECC800 Data Center Controller
V100R003C00 User Manual
NetEco
iManager NetEco Product
Documentation-(V600R008C10)
The ECC800/NetEco version depends on the version in use. Click
on the ECC800/NetEco
WebUI to obtain the current version.
For NetEco maintenance, see the NetEco documents.
2.3 Pre-fab. Module Entry Requirements
The following describes the requirements for working in the FusionModule1000.
Item
Requirement
Before entry
Obtain the entry permit.
The detailed operations are performed based on the requirements
specified by the manager of the FusionModule1000.
Entry
preparations
Obtain ESD clothes and shoes.
Remove dust from tools and materials that need to be taken into the