FusionModule1000A40 IT Solution
Quick Installation Guide (2016.05, AI Version)
2 Obtaining Technical Documents
Issue 03 (2018-01-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2
2
Obtaining Technical Documents
Table 2-1
Installation document list
Technical Document
Purpose
Obtaining Method
(Remarks)
FusionModule1000A40 IT Solution
V200R002C00 Installation Guide
(2016.05, AI Version)
Describes how to install
the prefabricated
All-in-One data center
solution and provides
the drawings required
during installation.
Download this
document from
FusionModule1000A40 IT Solution
V200R002C00 Commissioning Guide
(2016.05, AI Version)
Describes how to
perform power-on
commissioning for the
solution.
Download this
document from
FusionModule1000A40 IT Solution
V200R002C00 Maintenance Guide
(2016.05, AI Version)
Describes how to
perform O&M for the
solution.
Download this
document from
Initial Configuration Manual
Describes the initial
configurations of each
system in the solution
and provides the initial
configuration parameter
tables and component
layouts for each system.
Download this
document from
NetCol5000-A 20 kW Air-Cooled
In-Row Precision Air Conditioner
Quick Guide
Describes how to install
the precision air
conditioner.
See documents
delivered with the
product.
UPS2000-G-(15 kVA-20 kVA) Quick
Installation Guide
Describes how to install
the UPS2000-G.
Download this
document from
FusionModule1000A
V200R002C00&C10 Outsourced
Component Document Package
Describes how to use
and maintain
outsourced components.
Download this
document from