If the cable is not regular or the size does not meet the requirements, wrap waterproof sealing tape.
Step 4
Secure the waterproof metal connector using the dedicated feeder window wrench by
tightening the nut to a torque of 100 N·m, as shown in
Figure A-13
Securing the waterproof metal connector
Step 5
Apply transparent sealant onto the joint between the waterproof metal connector and the sheet
metal on the pre-fab. module, as shown in
Figure A-14
Applying sealant
Step 6
Spray water to test the waterproof performance of the waterproof metal connector.
----End
A.1.7 Attaching Cable Labels
Prerequisites
Cables have been connected.
You are clear about the connections of cables to be labeled.
Clear and specific label information facilitates future pre-fab. module maintenance work.
Preparations
Tool: pen