FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
2 Site Requirements
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
6
2.5 Water Refill and Drainage Requirements
2.5.1 Water Refill Requirements
The water refill ports for humidifiers must supply water continuously when the
FusionModule1000 is operating.
describes the requirements on the water refill ports and pipes.
Table 2-1
Water refill requirements
Port
Position
Port
Dimension
s
Water
Pressure
Requireme
nt
Transient
Water Flow
Pipe
Pressure
Bearing
Capacity
Remarks
For the
humidifier in
the smart
cooling
product
DN25 PP-R
pipe port
0.1–0.7 MPa
≥ 1.2 L/min
1 MPa
Consider
connectivity
to water
refill
devices.
describes the water quality requirements.
Table 2-2
Water quality requirements
Item
Allowed Value
Hydrogen ion
pH: 7–8.5
Conductivity at 20°C (σ
20
)
a
300–1250 μS/cm
Inlet water hardness specifications
b
≤ 100 mg/L
a: If σ
20
is less than 300 μS/cm, it takes a longer time for the humidifier to generate vapor
for the first time. If σ
20
is greater than 1250 μS/cm, the humidifier service life is affected.
b: If the water hardness exceeds 100 mg/L (CaCO
3
), a water softener should be installed.
It is recommended that water quality be tested by local professionals.
Anti-freezing measures must be applied for pipes in low-temperature areas.
2.5.2 Drainage Requirements
Condensate drain outlets and humidifier drain outlets are available at the ends of pre-fab.
modules.
Drainpipes must be able to withstand a temperature above 105°C; otherwise, pipe
deformation may occur .
Drainpipes near the pre-fab. module drainage port must be able to withstand a
temperature above 200°C; otherwise, pipe deformation may occur.