FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
6 Installing Devices Inside the Pre-fab. Module
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
43
Figure 6-6
Cuting the glue
5.
Remove the air intake and air exhaust vent covers.
Figure 6-7
Removing the connection box cover
Step 3
Install two bolts on the outdoor side wall to hang the device.