FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
6 Installing Devices Inside the Pre-fab. Module
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
50
Due to space limitation, connect power cables after you place batteries on one layer. Place
batteries in the battery cabinet from bottom to top and from right to left.
Figure 6-14
Installing the battery
2.
Install a battery copper bar.
Figure 6-15
Installing the battery copper bar
3.
Install copper bars between other batteries in the same way.
4.
Install the negative battery cable.