FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
6 Installing Devices Inside the Pre-fab. Module
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
54
Figure 6-19
Laying out the batteries
Step 3
Connect the battery short-circuit copper bar and reinstall the insulation cover.
Figure 6-20
Connect the battery short-circuit copper bar 1