iManager NetEco 6000
Device Installation and Commissioning Guide
6 Adding Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
204
Figure 6-66
Querying the ECC500 V6 version number
For details about how to modify the alarm names for ECC500 V3 dry contacts, see
Modifying Alarm
Names for Dry Contacts on the NetEco (for V1.1)
.
Modifying Alarm Names for Dry Contacts on the NetEco (for V1.1)
1.
Choose
Configuration
>
Configuration Management
>
Data Center Planning
from
the main menu. The
Data Center Planning
window is displayed.
2.
In the navigation tree on the left, select a collector in the rack to switch to the rack design
page.
3.
In the parameters setting area of the collector, expand the corresponding
Extended Info
tab, as shown in the following figure. The mapping relationship between the
Extended
Info
tab name and the collector port is displayed on the NetEco as follows:
−
If the dry contact is connected through an independent deployment AI/DI unit, see
and
−
If the dry contact is connected through an AI/DI expansion card, see
the mapping.