5.7 Installing pRRU Cables
This section describes the procedure of installing the pRRU cables.
5.7.1 Cabling Requirements
Cables must be routed according to the specified cabling requirements to prevent signal
interference.
NOTE
If certain cables listed below are not required, skip the requirements for routing these cables.
General Requirements for Cable Layout
Bending radius
l
The bending radius of a 1/4'' jumper, a 1/2'' softer jumper, and a 1/2'' common jumper must
be longer than 35 mm, 50 mm, and 127 mm, respectively.
l
The bending radius of a power cable is at least three times the diameter of the cable.
l
The bending radius of a signal cable must be at least five times of the diameter of the cable.
Cable binding
l
Cables of the same type are bound together.