Figure 3-20 Removing side plates
Step 3 Four to six persons are required to move the cabinet to the installation position.
Figure 3-21 Force-bearing position
(1) Force-bearing beam
Step 4 Install the side plates.
----End
3.6 Leveling and Combining Cabinets
NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual (2019)
3 Installation
Issue 03 (2020-08-30)
Copyright © Huawei Technologies Co., Ltd.
46