7.7 Installing the Adjustable Guide Rails for an SUD.....................................................................................................177
7.8 Installing an SUD.......................................................................................................................................................180
7.9 Installing Adjustable Guide Rails for a Fibre Channel Switch..................................................................................182
7.10 Installing a Fibre Channel Switch............................................................................................................................185
7.11 Installing Adjustable Guide Rails for an Ethernet Switch........................................................................................186
7.12 Installing an Ethernet Switch....................................................................................................................................188
7.13 Installing a Filler Panel.............................................................................................................................................189
7.14 Affixing a Label........................................................................................................................................................190
7.15 Setting Up a Heartbeat Network for CNENs............................................................................................................191
7.16 Connecting CNENs to the Service Network............................................................................................................194
7.17 Connecting SUCs to CNENs....................................................................................................................................198
7.18 Connecting Multiple SUDs to One SUC..................................................................................................................201
7.19 Connecting the CNEN to the Maintenance Terminal...............................................................................................206
7.20 Connecting SUCs to the Maintenance Terminal (PC)..............................................................................................208
7.21 Connecting Ground Cables.......................................................................................................................................211
7.22 Connecting Power Cables.........................................................................................................................................215
7.23 Powering On the N8500...........................................................................................................................................217
7.24 Checking Indicators..................................................................................................................................................219
7.25 Installing Front Panels..............................................................................................................................................228
8.1 Preparations................................................................................................................................................................232
8.2 Applying for a License in Entitlement Activation Mode...........................................................................................233
8.3 Applying for a License in Password Activation Mode...............................................................................................235
10.1 Directly Connecting CNENs to SUCs (with the S2600T Storage System as the Storage Unit)..............................250
10.2 Directly Connecting CNENs to SUCs (with the S5500T Storage System as the Storage Unit)..............................258
10.3 Directly Connecting CNESs to SUCs (with the S5600T, S5800T or S6800T Storage System as the Storage Unit)
..........................................................................................................................................................................................266
11.1 Connecting SUDs to One SUC (with the S2600T as the Storage Unit)...................................................................277
11.2 Connecting SUDs one SUC (with the S5500T as the Storage Unit)........................................................................282
11.3 Connecting SUDs to one SUC (with S5600T, S5800T or S6800T as the Storage Unit).........................................292
13.1 Cable Routing and Bundling....................................................................................................................................306
13.1.1 Cable Routing........................................................................................................................................................306
13.1.2 Cable Bundling......................................................................................................................................................306
13.2 Fiber Cabling and Bundling.....................................................................................................................................307
OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
Contents
Issue 02 (2015-09-22)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
vi