NO.
Indicator Name Description
4
Ethernet Activity/
Link indicator
l
Amber and on: There is a link.
l
Amber and blinking: There is link activity.
l
Off: There is no link or the link is disconnect.
5
Power LED
indicator
l
Green and on: Power supply is operating
normally.
l
Off: System is off or there is an internal power
supply failure.
7.25 Installing Front Panels
After all components are installed and operating properly after being powered up, install front
panels for a neat appearance.
Procedure
Step 1
Install a front panel for the clustered NAS engine enclosures.
1.
Align the upper side of the front panel with that of the clustered NAS engine enclosure.
2.
Keep pushing the two tabs towards the center of the front panel, as shown in step 1 of
Figure 7-41
Installing a front panel for the clustered NAS engine enclosure
3.
Use the front panel to cover the front side of SUC or SUC (as shown in step 2 of
). Then, release the tabs.
4.
Check the front panel to ensure that it has been proper installed and secured.
OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
7 N8500 Installation (with S5600T, S5800T or S6800T
Storage System as the Storage Unit)
Issue 02 (2015-09-22)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
228