3
Tools Preparation
All installation or test tools are ready before installation.
lists the installation tools required during the installation process.
Table 3-1
Installation tools
Name
Legend
Function
Marker pen
Used to mark a location and scale.
M3 to M6 Phillips
screwdriver
Used to fasten small screws or
bolts, and has a cross head.
Diagonal pliers
Used to cut insulation pipes and
cable ties.
Crimper
Used to crimp the ends of
metallic pipes when making
coaxial cables.
Paper knife
Used to cut tapes on the carton.
Floating nut mounting
bar
Used to assemble and disasseble
floating nuts.
ESD clothes
Used to prevent electrostatic
discharges.
OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
3 Tools Preparation
Issue 02 (2015-09-22)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
27