59
A
A
Underfloor Cabling
c
1
2
3
4
Route the clock cables into the cabinet through the
cable holes at the bottom of the cabinet.
Route the clock cables upwards along the side panel
of the cabinet to the cable distribution plate.
Route the clock cables through the cable distribution
plate and connect them to the clock ports on the AUX
board.
Trim the clock cables and bind them onto the binding
plate.
10
Installing and Routing Network Management Cables
ETH port
DCN
Network
management
cable
Network management computer
When routing network management
cables, use the method similar to
that for routing E1 cables.
Connect network management
cables only to the gateway NE.
NOTE
CAUTION