background image

Preparations 

Tools 

Unpacking and Checking 

Do not move the PDU by holding its mounting brackets, front panel, or terminal cover.When you move it, see the movement 

regulations. 

No. 

Item 

Visually inspect the PDU appearance for shipping damage. If any shipping damage is found, report it to the carrier 
immediately. 

Check the PDU bar code and ensure that it complies with the order. Check against the delivery list that the types of 
fittings are complete and correct. If there is any discrepancy, contact your local Huawei office immediately. 

< 18 kg (< 40 lb) 

18–32 kg (40–70 lb) 

32–55 kg (70–120 lb) 

> 55 kg (> 120 lb) 

Device Movement Regulations 

Wire stripper 

Polyvinyl chloride 

(PVC) insulation tape 

Heat gun 

           Cable tie 

Protective gloves 

Insulation gloves 

Cotton cloth 

Hydraulic pliers 

Heat shrink tubing 

(Φ6) 

Electrician's knife 

Multimeter 

Phillips screwdriver 

(PH2 x 150 mm or 

PH3 x 250 mm) 

Torque screwdriver 

Crimping tool 

Flat-head screwdriver 

Get installation tools insulated to prevent electric shocks. 

Summary of Contents for PDC-0038V4ACIOA

Page 1: ...HUAWEI TECHNOLOGIES CO LTD PDC 0038V4ACIOA V100R001 Quick Installation Guide Issue 01 Part Number 31505549 Date 2013 05 15 ...

Page 2: ...low the local laws and regulations Personnel Requirements 1 Only trained and qualified personnel are allowed to install operate and maintain Huawei equipment and they must understand basic safety precautions 2 You can modify default parameters only after being granted approval from Huawei technical support Symbols Alerts you to a potentially hazardous situation that could if not avoided result in ...

Page 3: ...orts 5 Bypass input ports 6 Mains input ports 7 Output socket group 1 250 V AC 15 A 8 Output socket group 1 fuses 9 Output socket group 2 fuses 10 Output socket group 2 250 V AC 10 A 11 UPS 1 mains input port 12 UPS 2 mains input port 13 UPS 1 bypass input port 14 UPS 2 bypass input port 15 UPS 1 output port 16 UPS 2 output port PDC is short for power distribution cabinet UPS is short for uninterr...

Page 4: ...st the delivery list that the types of fittings are complete and correct If there is any discrepancy contact your local Huawei office immediately 18 kg 40 lb 18 32 kg 40 70 lb 32 55 kg 70 120 lb 55 kg 120 lb Device Movement Regulations c Wire stripper Polyvinyl chloride PVC insulation tape Heat gun Cable tie Protective gloves Insulation gloves Cotton cloth Hydraulic pliers Heat shrink tubing Φ6 El...

Page 5: ... secure them with screws The floating nuts are delivered with the adjustable guide rails 2 Before you install guide rails accurately calculate the distance 3 U between the upper and lower guide rails A Attach the mounting brackets for the adjustable guide rails to mounting bars B Install floating nuts by using a flat head screwdriver Mounting bracket notch Mounting bar Floating nut Flat head screw...

Page 6: ...attery pack 3 Optional 3 U battery pack 4 Do not move the PDU by holding its mounting brackets front panel or terminal cover When you move it see the movement regulations Tower mounting the PDU b When you change from rack mounting to tower mounting rotate the logo anticlockwise 90 degrees 1 The support base length is adjustable You can add components to increase the length 2 Exert force to disasse...

Page 7: ...mm between the support bases place devices on the support bases and secure them Assemble support bases When you assemble two support bases align connecting buckles with holes and insert the buckles vertically as shown in the following figure Support base Connecting buckle Components installed between support bases 3 U battery packs 3 U UPSs 3 U PDC 0038V4ACIOA Rubber plugs Cable Installation Remov...

Page 8: ...regulations 3 If customers purchase input and output power cables by themselves use the cables that comply with standards proposed by Underwriters Laboratories UL or International Electrotechnical Commission IEC Device Tool Screw Torque UPS2000 G 15 kVA M5x0 8p 1 5 N m UPS2000 G 20 kVA M5x0 8p 1 5 N m PDU M5x0 8p 1 5 N m Torque screwdriver Torque for tightening power cables Cable list Connecting C...

Page 9: ...th the PDU 5 UPS 1 mains input power cable N A Delivered with the PDU 6 UPS 1 AC output power cable N A Delivered with the PDU 7 UPS 2 bypass input power cable N A Delivered with the PDU 8 UPS 2 mains input power cable N A Delivered with the PDU 9 UPS 2 AC output power cable N A Delivered with the PDU 10 Maintenance bypass port cable RVV 4x0 5 Prepared onsite connectors provided 11 CAN communicati...

Page 10: ...nnect cables when there are two mains inputs In the case of one mains input connect the mains input power cables to the AC BYPASS INPUT ports the AC MAINS INPUT ports are not connected Cable connection diagram 10 3 MBS is short for maintenance bypass switch 2 1 9 6 7 4 8 5 11 Mapping between cable connectors for CAN communications ports ...

Page 11: ...s follows Open the maintenance bypass circuit breaker cover on the PDU front panel The UPS generates the Maint Breaker close alarm the Alarm indicator is on and the buzzer buzzes and transfers to bypass mode Close the maintenance bypass circuit breaker on the PDU front panel Open the UPS input and output circuit breakers on the PDU front panel and the battery switch if the battery pack does not ha...

Page 12: ...Huawei Technologies Co Ltd Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China www huawei com ...

Reviews: