6
After the PDU is tower-mounted, seal the four screw holes on the top with rubber plugs that are delivered with the PDU.
b
Install two support bases for each group of devices. Place the support bases on the floor, determine the distance (greater
than or equal to 280 mm) between the support bases, place devices on the support bases, and secure them.
Assemble support bases. When you assemble two support bases, align connecting buckles with holes and insert the
buckles vertically, as shown in the following figure.
Support
base
Connecting
buckle
Components
installed
between
support
bases
3 U battery packs
3 U UPSs
3 U PDC-
0038V4ACIOA
Rubber plugs
Cable Installation
Remove the front panel from the PDU and open the circuit breakers.
OFF