Figure 3-82
Tightening the cable tie
Step 5
Cut off the surplus part of the cable tie evenly at the root by using cutting pliers, as shown in
and
.
Figure 3-83
Cutting off the surplus part of the cable tie
Figure 3-84
Installed label
HUAWEI NetEngine80E Router
Installation Guide
3 On-site Cable Assembly and Installation
Issue 02 (2011-09-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
67