–
Install the two terminals back to back, as shown in
Figure 3-46
Bending the upper OT terminal at a 45- or 90-degree angle
Figure 3-47
Crossing two terminals
Figure 3-48
Installing two terminals back to back
HUAWEI NetEngine80E Router
Installation Guide
3 On-site Cable Assembly and Installation
Issue 02 (2011-09-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
47