4.1 Installing the NE80E in a Cabinet
1.Unpacking the Device
NOTE
l
Move the wooden cases into the equipment room or near the equipment room (if space permits) before
unpacking. In this way, you can avoid damage to the router during the transportation after unpacking.
l
Wear gloves during unpacking cases to protect your hands.
1.Adjusting the height of the slide rail
1U=44.5mm
The height of three holes on the mounting rails is 1U
2.Positioning captive nuts using rack-mounting ear
HUAWEI NetEngine80E Router
Installation Guide
4 Installing NE80E
Issue 02 (2011-09-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
75