5.1 Checking the Installation
After you complete the hardware installation, you need to check the installation of the devices
and cables.
Prerequisite
All hardware devices and cables must be installed.
Background Information
A check before power-on is performed to ensure that the hardware is installed properly. This is
mainly to check the appearance of the devices, and also the cabinet, cables, plugs, sockets, labels,
and environment.
5.1.1 Device Installation Checklist
This section provides a checklist for checking an installed device before power-on.
CAUTION
Before power-on, make sure that the switches of all power distribution units (PDUs) and power
distribution frames (PDFs) are in the "OFF" state.
lists the items that need to be checked for the installed device.
Table 5-1
Checklist for the installed device
No.
Check Item and Description
Method
1
The cabinet is placed as required in the
design drawing.
Check this according to the engineering
design document.
2
The expansion bolts used to fix the
cabinet or holder to the ground are
fastened firmly. Flat washers and spring
washers are used and spring washers are
placed on top of flat washers.
Check this according to the following
figure.