Task
Description
Remarks
Powering devices on
Power the devices on and
check whether they operate
properly.
Setting IP addresses
Set IP addresses for relevant
devices.
Installing devices
Install the devices in the RP
system.
Placing devices
Place the devices according
to the guide diagram.
Connecting devices
Connect the devices in the
specified order using
prepared cables.
System upgrade
Upgrade relevant devices.
Configuring system settings
Setting parameters according
to relevant chapters.
Adjusting video quality
Configure video devices.
2.2 Tools
Table 2-2
Tools
Tool
Illustration
Model and
Specifications
Function
Phillips screwdriver
PH2
Used to install
mechanical parts.
Flat-head
screwdriver
Used to secure cables
connected to the
codec.
Allen wrench
5 mm (1 pc)
6 mm (1 pc)
Used to adjust
mechanical parts of
the display.
Diagonal pliers
Used to cut cables
and cable ties.
Measuring tape
Length:
≥
7.5 m
HUAWEI RP100&RP200 Room Presence
Commissioning Guide
2 Deployment Preparation
Issue 01 (2015-02-12)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8