Figure 5-8 Creating a PV plant (Method 2)
●
Method 3: On the home page, click Plants in the upper-right corner to go to
the Device page, and choose Device Access, select any device, and click Bind
to New Plant.
NO TE
At least one device must be connected in the Device Access.
Figure 5-9 Creating a PV plant (Method 3)
Step 4 Fill in the basic information about the PV plant as required and click Next.
Figure 5-10 Basic information of the PV plant
Table 5-1 Description of basic information (* means required fields)
Parameter
Description
Company*
Company to which the new PV plant belongs.
Plant name*
Name of the new PV plant.
Grid connection time*
Start date of the safe operation of the PV plant.
FusionSolar Smart PV Management System
Connection
User Manual (Inv SDongleA)
5 Site Deployment and Commissioning