Step 25 Remove the screw and nut.
NO TE
Pry up one corner of the box cover with a wrench to take out the nut. When prying up, pay
attention to avoid the spanner entering too much to touch the sealing gasket.
Step 26 Install the box cover bolts and tighten them according to the torque.
NO TE
As there are many bolts on the box cover and the area of the box cover is large, when
tighten part of the bolts, the deformation of the box cover may cause the loosening of
other bolts that have been tightened. Therefore, all bolts shall be tightened for no less than
3 times in sequence.
Installation torque: 45 Nm.
Step 27 Open gas relay valve