Figure 4-18 Mounting holes (unit: mm, two SmartLi cabinets and one lithium
battery side cabinet)
Step 2 Use a hammer drill to drill holes for installing expansion bolts and then install
expansion bolts in the holes.
1. Drill holes into the concrete floor using a hammer drill. The hole depth ranges
from 52 mm to 60 mm.
2. Partially tighten the expansion bolts and vertically insert them into the holes.
Knock the expansion bolts using a rubber mallet until the expansion sleeves
are fully inserted into the holes.
3. Partially tighten the expansion bolts.
4. Remove the bolts, spring washers, and flat washers.
Step 3 Move the cabinets to the installation positions.
1. Wheel the SmartLi cabinet to the installation position.
2. Move the lithium battery side cabinet to the installation position.
Step 4 Secure the cabinets.
1. Install connecting plates between cabinets.
2. Remove the two plugs from the bottom of the SmartLi cabinet.
3. Secure the SmartLi using M12x115 bolts, and secure the lithium battery side
cabinet using M12x60 bolts.
SmartLi 2.0
User Manual
4 Installation
Issue 09 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
58