Step 5 Route the fire-trace tube and dry contact cable in the SmartLi.
1. Loosen the cable clip at position A so that the fire-trace tube can be routed
smoothly, and take out the fire-trace tube and dry contact cable reserved on
the side.
2. Route the fire-trace tube and dry contact cable along the path shown in the
figure, and route them through the hole on the top of the cabinet.
3. Secure all cable clips, and arrange the fire-trace tube and dry contact cable.
Figure 4-21 Routing the fire-trace tube and dry contact cable
Step 6 Secure the corrugated pipe, and route the fire-trace tube and dry contact cable in
the lithium battery side cabinet.
1. Route the fire-trace tube and dry contact cable through the corrugated pipe,
and secure the ends of the corrugated pipe.
2. Route the corrugated pipe, fire-trace tube, and dry contact cable through the
hole in the lithium battery side cabinet.
3. Secure the corrugated pipe and dry contact cable using cable ties.
4. Secure the fire-trace tube to the buckle.
SmartLi 2.0
User Manual
4 Installation
Issue 09 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
60