Figure 4-22 Securing the corrugated pipe and routing the fire-trace tube and dry
contact cable (one SmartLi cabinet and one lithium battery side cabinet)
Figure 4-23 Securing the corrugated pipes and routing the fire-trace tubes and
dry contact cables (two SmartLi cabinets and one lithium battery side cabinet)
Step 7 Install the fire-trace tube.
SmartLi 2.0
User Manual
4 Installation
Issue 09 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
61