Figure 4-31 Pulling out the BCU
Step 2 Install battery modules and covers.
NO TE
● If half-capacity cabinet configuration is adopted, install filler panels at the positions
where battery modules are not installed.
● In the 8+0 scenario, the lowest filler panel can be installed only after battery
communications cables are installed.
Figure 4-32 Installing battery modules and covers
(1) Full-capacity cabinet (8+8 scenario)
(2) Half-capacity cabinet (8+0 scenario)
SmartLi 2.0
User Manual
4 Installation
Issue 09 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
68