b. Move the cabinet to the installation position.
c.
Remove the battery trays shown in the figure and secure the cabinet to
the ground.
Figure 4-64 Securing the cabinet to the ground (using spring pins)
Figure 4-65 Securing the cabinet to the ground (using screws)
d. Secure the antiseismic kits to the ground.
SmartLi 2.0
User Manual
4 Installation
Issue 09 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
85