Figure 4-66 Installing front and rear door headers and securing
antiseismic kits
Step 10 Install battery modules and cables.
Step 11 Install the front conversion brackets and front antiseismic kits.
Figure 4-67 Installing conversion brackets and antiseismic kits
(A) Spacing of 18 round holes
(B) Spacing of 19 round holes
(C) Spacing of 14 round holes
(D) Spacing of 3 round holes
----End
SmartLi 2.0
User Manual
4 Installation
Issue 09 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
86