(Optional) Installing the Smart Dongle

3.4

USB-4G port cover (USB-4G)

Reinstalling the Smart Dongle enclosure, ensure 
that the buckle springs back to the original position.

2.4

The USB-4G port is available only for a Smart Dongle, rather than a USB data cable.

Install the SIM card in the direction shown by the silk screen and arrow on the slot.

Press the SIM card until it snaps into place and locked, which means that the SIM card is 
installed correctly.

To remove the SIM card, push it inwards. The SIM card will spring out automatically.

The 4G Smart Dongle model is SDongleA-03. For details, see the quick 
guide that is delivered with the Smart Dongle. 
You can also scan the QR code to obtain it.

NOTE

Summary of Contents for SUN2000-2KTL-L0

Page 1: ...0 HUAWEI TECHNOLOGIES CO LTD SUN2000 2KTL 5KTL L0 Quick Guide Issue 02 Part Number 31509986 Date 2019 04 27 ...

Page 2: ...k that the package contents are intact and complete against the packing list If any damage is found or any component is missing contact your dealer 5 Huawei shall not be liable for any device damage caused by the violation of instructions in this document 6 The cable colors involved in this document are for reference only Select cables in accordance with local cable specifications Solar inverter 1...

Page 3: ...erminals PV1 PV1 9 DC input terminals PV2 PV2 10 COM port COM 11 USB 4G port cover USB 4G 12 AC output port AC 13 Antenna port ANT 14 Ground point For the model without an external WiFi antenna the antenna port ANT is actually a cover and there is no port inside NOTE Installation Requirements 3 1 Tilt and Space 3 Installing the Device ...

Page 4: ... need to be installed see SUN2000 2KTL 5KTL L0 User Manual for the installation dimensions Wall mounted Installation Installing the Mounting Bracket 3 2 Avoid drilling holes in the utility pipes and or cables attached to the back of the wall ...

Page 5: ... advised to apply anti rust paint on the hole positions for protection Installing the SUN2000 3 3 If the bottom of the mounting plate does not snap into place push the SUN2000 from the front until the bottom of the mounting plate snaps into the mounting bracket The anti theft lock needs to be prepared by the customer 1 Install the SUN2000 on the mounting bracket 2 Tighten screw assemblies 3 Option...

Page 6: ...ata cable Install the SIM card in the direction shown by the silk screen and arrow on the slot Press the SIM card until it snaps into place and locked which means that the SIM card is installed correctly To remove the SIM card push it inwards The SIM card will spring out automatically The 4G Smart Dongle model is SDongleA 03 For details see the quick guide that is delivered with the Smart Dongle Y...

Page 7: ... cable Two core L and N outdoor copper cable or three core L N and PE outdoor copper cable 4 6 mm2 10 21 mm 3 DC input power cable Standard outdoor PV cable in the industry recommended model PV1 F 4 6 mm2 4 5 7 8 mm 4 Signal cable optional Outdoor shielded twisted pair 0 25 1 mm2 4 11 mm Connect cables in accordance with the installation laws and regulations of the country or region where the SUN2...

Page 8: ...C output port is used only as a PE equipotential point and cannot substitute for the PE point on the enclosure NOTE 1 Connect the AC output power cable to the AC connector Installing the AC Output Power Cable 4 3 Ensure that the protection layer of the AC output power cable is in the connector and that the exposed core wire is totally inserted into the cable hole and connected securely Failing to ...

Page 9: ...8 Click AC output port AC Two Core Cable L and N 2 Connect the AC connector to the AC output port and then Check the route of the AC output power cable ...

Page 10: ...tive metal terminals and black DC connectors supplied with the inverter Using incompatible positive and negative metal terminals and DC connectors may result in serious consequences The caused device damage is not covered under any warranty 7 If polarity of the DC input power cable is reversed and the DC switch is ON do not turn off the DC switch immediately or unplug positive and negative connect...

Page 11: ...sure that it is connected securely Ensure that the cable will not be extracted after crimped Positive metal terminal Negative metal terminal Positive connector Negative connector Ensure that the locking nut is secured Ensure that the cables are correctly connected Pull the DC input power cable back to ensure that it is connected securely Click ...

Page 12: ...le gland If two signal cables are required ensure that they have the same outer diameter No Label Definition Description 1 485B1 RS485B RS485 differential signal Reserved can connect to the RS485 signal port on the energy meter 2 485A1 RS485A RS485 differential signal 3 485B2 RS485B RS485 differential signal Reserved can connect to the RS485 signal port on SmartPSB2000L smart PV safety box 4 485A2...

Page 13: ...ustomer 4 Cable ties are secured evenly and no burr exists 5 The ground cable is connected correctly and securely 6 The DC switch and all the switches connecting to the SUN2000 are OFF 7 The AC output power cable DC input power cable and signal cable are connected correctly and securely 8 Unused terminals and ports are locked by watertight caps 9 The installation space is proper and the installati...

Page 14: ...ilable on the left side of the SUN2000 Type Status Blinking at Long Intervals On for 1s and then Off for 1s Blinking at Short Intervals On for 0 2s and then Off for 0 2s Meaning Running indication LED1 LED2 N A Steady green Steady green The SUN2000 is exporting power to the power grid Blinking green at long intervals Off The DC is on and the AC is off Off Blinking green at long intervals The DC is...

Page 15: ...on Color Status Yellow blinking green and red simultaneously Steady on The Dongle is secured and powered on Green Blinking in a 2 second cycle on for 0 1s and then off for 1 9s Dialing duration 1 min Blinking at long intervals on for 1s and then off for 1s The dial up connection is set up successfully duration 30s Steady on Successfully connected to the management system Blinking at short interval...

Page 16: ...ion If you have an installer account skip this step NOTE Creating the first installer account will generate a domain named after the company To create multiple installer accounts for the same company log in to the FusionSolar and tap New User ...

Page 17: ...see the FusionSolar App Quick Guide You can scan the QR code to obtain it 3 Creating a PV Plant and an Account for User Inverter commissioning 7 2 1 Access Inverter commissioning Method 1 before login Method 2 after login ...

Page 18: ...n and change it immediately after login To ensure account security change the password periodically and keep the new password in mind Not changing the initial password may cause password disclosure A password left unchanged for a long period of time may be stolen or cracked If a password is lost devices cannot be accessed In these cases the user is liable for any loss caused to the PV plant To set...

Page 19: ... Japan Japan_ESC ms huawei com 0120258367 India India indiaenterprise_TAC huawei com 1800 103 8009 South Korea South Korea Japan_ESC ms huawei com North America USA na_inverter_support huawei com 1 877 948 2934 Canada na_inverter_support huawei com 1 855 482 9343 Latin America Mexico la_inverter_support huawei com 018007703456 0052 442 4288288 Argentina 0 8009993456 Brazil 0 8005953456 Chile 80020...

Page 20: ...Huawei Technologies Co Ltd Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China solar huawei com ...