SUN2000-(55KTL, 60KTL) Series
User Manual
5 Electrical Connections
Issue 02 (2017-07-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
49
Figure 5-21
Routing cables
Step 4
Install the terminal base on the terminal block, and connect the shield layer to the ground
point.
When connecting the shielded cable, crimp the OT terminal if required.