SUN2000-(55KTL, 60KTL) Series
User Manual
1 Safety Precautions
Issue 02 (2017-07-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1
1
Safety Precautions
Before performing operations, read through this manual and follow all the precautions to
prevent accidents. The safety precautions provided in this document do not cover all the
safety precautions. Huawei shall not be liable for any consequence caused by the violation of
the safety operation regulations and design, production, and usage standards.
Disclaimer
Huawei shall not be liable for any consequence caused by any of the following events.
Transportation
The storage conditions do not meet the requirements specified in this document.
Violate the operation instructions and safety precautions in this document for installation,
cable connecting, and maintenance.
Operation in extreme environments which are not covered in this document
Unauthorized modifications to the product or software code
Installation or use in environments which are not specified in related international
standards
Personnel Requirements
Only certified electricians are allowed to install and operate the SUN2000.
Operation personnel should receive professional training.
Operation personnel should read through this document and follow all the precautions.
Operation personnel should be familiar with the safety specifications about the electrical
system.
Operation personnel should understand the composition and working principles of the
grid-tied PV power system and local regulations.