If you connect a ground cable to the ground point in the maintenance
compartment, you are advised to use a four-core (L1, L2, L3, and PE)
outdoor cable.
●
You need to prepare OT-M10 terminals that match the cables.
Table 5-1 AC Power Cable Specifications
Cable Specifications
Copper-Core Cable
Copper-Clad
Aluminum Cable or
Aluminum Alloy
Cable
Conductor cross-
sectional area
(mm
2
)
Range
25–120
25–120
Recomm
ended
value
35
70
Table 5-2 Ground cable specifications
Cross-Sectional Area S (mm
2
) of the
AC Power Cable Conductor
Cross-Sectional Area S
P
(mm
2
) of
the PE Cable Conductor
16 < S ≤ 35
S
P
≥ 16
35 < S
S
P
≥ S/2
The values in this table are valid only if the PE cable and AC power cable use
the same conductor material. If this is not so, the cross-sectional area of the PE
cable conductor is to be determined in a manner which produces a conductance
equivalent to that which results from the application of this table.
Installing the PE Cable
Step 1 Crimp an OT terminal.
Step 2 Secure the PE cable using the ground screw.
Figure 5-7 Connecting a PE cable
SUN2000-(60KTL, 65KTL)-M0
User Manual (Mexico Edition)
5 Electrical Connections
Issue 06 (2020-10-12)
Copyright © Huawei Technologies Co., Ltd.
41