5
Install and Configure
5.1 Tool Preparations
5.2 Safety Symbols on Devices
5.3 ESD Protection
5.4 Environmental Requirements
5.5 Unpacking the Chassis
5.6 Installing Optional Parts
5.7 Installing the Server on Guide Rails
5.8 Connecting External Cables
5.9 Powering On and Off the Server
5.10 Initial Configuration
5.1 Tool Preparations
Prepare the following tools:
●
ESD wrist strap or ESD gloves
●
M3 Phillips screwdriver
●
Protective gloves
●
ESD bag
●
Flat-head screwdriver
TaiShan 200 Server
User Guide (Model 2280)
5 Install and Configure
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
40