TP48200A-HX09A2 & TBC300A-TCA2
Installation Guide
4 Installing Cabinets
Issue 01 (2013-10-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
35
Figure 4-1
Removing the cabinet from the pallet
(1) Pallet
----End
4.3 Marking Hole Positions
Prerequisites
The installation environment is clean and dry.
The concrete pad on which the cabinet is to be installed is flat.
Procedure
Step 1
Remove the cover from the cabinet packaging box and find the hole marking-off template on
the cover interior, as shown in