Method 2: If there are adjustable guide
rails, install two adjustable guide rails and
two floating nuts.
Method 1: If there are no adjustable
guide rails, install six floating nuts.
3. Install guide rails using either of the methods.
Adjustable guide rails
Avoid pushing guide rails out of the rack
when placing the battery pack, power
distribution unit (PDU), and UPS on the
rack because the front ends of the guide
rails are not screwed. The length of guide
rails ranges from 592.37 mm to 807.37
mm, the width is 30 mm, and the height
is 87 mm. The guide rails are scalable and
support Huawei M-type cabinets.
Floating nut
Front
Rear
M6x16 (4 PCS)
3 N•m
UPS (3 U)
4. Secure the devices.
Battery pack
(optional, 3 U)
M6x16 (6 PCS)
3 N•m
4