UPS (3 U)
BoostLi Energy Storage
Module (4.5 U)
PDU (2 U)
Rectifier
4
2
Installing Devices
1. Determine the installation space.
1. Install devices from
bottom to top, as shown
in the figures.
2. The UPS currently
supports two BoostLi
energy storage modules.
To install more BoostLi
energy storage modules,
contact Huawei
technical support.
NOTE
a) Install the mounting brackets for the UPS.
1. Before installation, read the user manual carefully to get familiar with product information and
safety precautions.
2. Use insulated tools during installation.
3. Only engineers certified by Huawei or its agents are allowed to install, commission, and
maintain the UPS. Otherwise, personal injury or equipment damage may occur, and the UPS
faults caused are beyond the warranty scope of Huawei.
2. Install the BoostLi energy storage modules on the rack in the bottom-up sequence.
3. Install the UPS on the rack.
≥ 1 U space
≥ 1 U space