UPS
Capacity
Component
Specifications
Vendor
60 kVA
the circuit breaker is located
is less than 6 kA)
S283 C100
80 kVA
T1N160 TMD R125 3P FFC
ABB (recommended when the
short-circuit current where
the circuit breaker is located
is less than 36 kA)
120 kVA
T3N250 TMD R200 3P FF
NO TE
● The upstream input and downstream output circuit breakers recommended in the table
are for reference only.
● If multiple loads are connected, use recommended specifications for branch circuit
breakers.
● Select proper circuit breakers to protect loads and cables, and cascade them properly to
achieve selective protection.
1.1.4 Transportation, Unpacking, and Checking
NO TICE
● Only trained personnel are allowed to move the device. Use a forklift to
transport the equipment case secured to a wooden support to the installation
position.
● To prevent the cabinet from toppling, secure it to a forklift using ropes before
moving it.
● To prevent shocks or falls, move the UPS gently. To avoid damaging the
equipment, exercise caution when removing the packing materials. Keep the
UPS steady during unpacking.
● If the UPS installation environment is in poor condition and the UPS needs to
be stored for a long time after it is unpacked, take measures to prevent dust. It
is recommended that the UPS be wrapped with the original plastic packing.
1.1.4.1 30 kVA/40 kVA UPS
Procedure
Step 1 Verify that the UPS packing case is not damaged. If any damage is found, report it
to the carrier immediately.
Step 2 Use a forklift to transport the UPS to the installation position.
Step 3 Cut off and remove the binding straps.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide
1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd.