Step 7 Place the UPS in the installation position.
----End
1.1.4.2 60 kVA/80 kVA/120 kVA UPS
Procedure
Step 1 Verify that the UPS packing case is not damaged. If any damage is found, report it
to the carrier immediately.
Step 2 Use a forklift to transport the UPS to the installation position.
Step 3 Hold the sliding plate steady. Cut and remove the binding straps. Put down the
sliding plate gently.
Figure 1-6 Removing binding straps
Step 4 Remove the packing materials and foam.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide
1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd.
15