Step 9 Push the cabinet along the sliding plate to the installation position.
----End
1.2 Single UPS Installation (30 kVA/40 kVA)
1.2.1 Installing the Chassis
Tower-mounted Installation
Step 1 Assemble support bases. When you assemble two modules, align the connecting
buckle with the hole.
Figure 1-10 Assembling support bases
Step 2 Pull out the rear handle from the device.
1. Loosen the screws on the back-end handle anticlockwise.
2. Pull the handle out of the groove.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide
1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd.
18