1. Press the switch on the rear handle.
2. Push the handle into the groove.
3. Tighten the screws on the rear handle clockwise.
Figure 1-13 Pushing the rear handle into the groove
Step 5 Install the front panel.
1. Insert the lower end of the panel into the UPS.
2. Gently close the upper end of the panel.
Figure 1-14 Installing the front panel
Step 6 To prevent misoperations, you are advised to install a lock (diameter of the
effective lock cylinder: 5–6.3 mm) for the maintenance bypass switch.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide
1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd.
20