Figure 1-46 Installing a reinforced beam (front view)
Step 3 Use scale plates to determine the installation positions of floating nuts at the left
and right sides on the front of the rack, and install floating nuts.
NO TICE
Level the Bottom line on the scale plate with the lower edge of U sale 01 on the
rack. Install floating nuts onto the mounting holes for the mounting bar that
corresponds to Hole location lines.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide
1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd.
39