Figure 1-47 Determining floating nut installation positions
(1) Floating nut installation positions
(2) Scale plate
Figure 1-48 Installing a floating nut
Step 4 Flip the ready switches on the power units to (not ready), and remove the
power units.
NO TICE
Two persons are required to move a power unit. Keep the power unit horizontal
during movement.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide
1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd.
40