Figure 1-56 Removing the cover
Step 2 Remove the small covers from the bottom of the chassis based on the number
and positions of cables.
Figure 1-57 Removing small covers
Step 3 Install ground cables.
UPS5000-A-(30 kVA–120 kVA)
Quick Guide
1 Installation
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd.
46