Contents
About This Document................................................................................................................ ii
1 Installation................................................................................................................................ 1
1.1 Installation Preparations....................................................................................................................................................... 1
1.1.1 Site Planning..........................................................................................................................................................................1
1.1.2 Tools......................................................................................................................................................................................... 2
1.1.3 Preparing Power Cables..................................................................................................................................................... 6
1.1.4 Transportation, Unpacking, and Checking................................................................................................................ 13
1.1.4.1 30 kVA/40 kVA UPS....................................................................................................................................................... 13
1.1.4.2 60 kVA/80 kVA/120 kVA UPS.....................................................................................................................................15
1.2 Single UPS Installation (30 kVA/40 kVA)..................................................................................................................... 18
1.2.1 Installing the Chassis........................................................................................................................................................18
1.2.2 UPS Cable Connection Reference.................................................................................................................................27
1.2.3 Installing Cables................................................................................................................................................................. 28
1.2.4 Connecting a Remote EPO Switch...............................................................................................................................33
1.3 Single UPS Installation (60 kVA/80 kVA/120 kVA)................................................................................................... 33
1.3.1 Installing the Chassis........................................................................................................................................................33
1.3.2 Installing Antiseismic Kits............................................................................................................................................... 43
1.3.3 UPS Cable Connection Reference.................................................................................................................................44
1.3.4 Installing Cables................................................................................................................................................................. 45
1.3.5 Connecting a Remote EPO Switch...............................................................................................................................51
1.4 Installing a Parallel System............................................................................................................................................... 51
1.5 Verifying the Installation.................................................................................................................................................... 55
2.1 Powering On and Starting the UPS................................................................................................................................ 60
2.1.1 Power-On............................................................................................................................................................................. 60
2.1.2 Initial Startup...................................................................................................................................................................... 60
2.1.3 Starting the Inverter......................................................................................................................................................... 62
2.1.4 Powering On Loads...........................................................................................................................................................64
2.1.5 (Optional) Setting Parameters for the BCB Box..................................................................................................... 64
2.2 Shutting Down and Powering Off the UPS..................................................................................................................64
2.3 Clearing the EPO State....................................................................................................................................................... 66
UPS5000-A-(30 kVA–120 kVA)
Quick Guide
Contents
Issue 14 (2022-09-06) Copyright © Huawei Digital Power Technologies Co., Ltd.
v