UPS5000-A-400 kVA
User Manual (50 kVA, PF=0.9)
3 Installation
Issue 03 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
57
Ensure that the installation floor is flat.
The marking-off template is delivered with the UPS and is placed at the top of the UPS.
Step 1
Determine the position for installing the UPS and mark mounting holes, as shown in
Figure 3-17
Marking-off template
Figure 3-18
Hole dimensions (Unit of measurement :mm)
Step 2
Use a hammer drill to drill holes for installing the expansion bolts and then install the eight
expansion bolts in the holes.
shows an expansion bolt.
install an expansion bolt.