UPS5000-A-400 kVA
User Manual (50 kVA, PF=0.9)
3 Installation
Issue 03 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
63
Figure 3-25
Mounting holes (Unit of measurement: mm)
Step 2
Drill holes for installing expansion bolts, and install expansion bolts.
Step 3
Open the front door and remove support baffle plates on the front of the cabinets, as shown in
. Remove the rear covers.
Figure 3-26
Removing support baffle plates
Step 4
Use sixteen M6 screws to secure the four antiseismic kits to the front and rear of the cabinet
respectively, as shown in