UPS5000-A-500 kVA
User Manual (e-shelter)
4 User Interface
Issue 02 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
112
Figure 4-44
USB operations 2
Starting or Shutting Down the Inverter
Item
Description
Inv. ON
The
Inv. ON
screen allows you to start the inverter
manually.
Inv. OFF
The
Inv. OFF
screen allows you to shut down the
inverter manually.
ECM Switchover
Only professional personnel are allowed to use this function.
Clear faults before performing ECM active/standby switchover.
After an ECM is inserted, active and standby switchover is supported only after the ECM
is configured and starts working properly (about 30 seconds).
If the ECM to be maintained is still working, perform ECM active/standby switchover on this
screen (a dialog box is displayed for you to confirm this operation). After performing
active/standby switchover, ensure that this ECM is in standby state (that is, the green indicator
is blinking) and then maintain the ECM.
iBOX control
Reset the specified iBOX and iBAT, and sets the iBAT blinking function or measures the
iBAT internal resistance.
Item
Description
Reset
Restart an iBAT or an iBOX.